BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Plone.org//NONSGML plone.app.event//EN
X-WR-TIMEZONE:America/New_York
BEGIN:VEVENT
SUMMARY:Coon Creek Bridge 2007
DTSTART;TZID=US/Eastern;VALUE=DATE-TIME:20070113T100000
DTEND;TZID=US/Eastern;VALUE=DATE-TIME:20070113T185500
DTSTAMP;VALUE=DATE-TIME:20260403T232054Z
UID:0efa8b44f664e3ed6804bdaa2355f4f4
CATEGORIES:Baker Trail
CATEGORIES:Maintenance
CATEGORIES:Day Hike
CATEGORIES:Special
CONTACT:Patty Brunner\, 724-325-3224\, pabrunner2@cs.com
CREATED;VALUE=DATE-TIME:20070104T000409Z
DESCRIPTION:Saturday January 13\, 2007\nProject Leader Keith Klos has buil
 t\, marked and disassembled a 16 foot bridge.  It is ready for installatio
 n. The shortest route from the road to the bridge site is about ½ mile.  
 We need to carry the disassembled structure in and reassemble it.  We need
  volunteers to help with this project!  PLEASE\nLocation: 2 miles north of
  Vowinkle.  1.5 Miles south of the northern Baker Trailhead.\nStart time 1
 0AM at worksite – call for directions \nShuttle meets in Kittanning 8:30
 AM. We might be able to use a small cabin in the area Friday or Saturday N
 ight if needed.\nI’ll provide sandwiches for lunch.  \nEquipment require
 d: old external frame packs without the fabric\, light rope to secure the 
 material to the frame or 10ft of sizzle rope to carry bundles. Hammers\, G
 LOVES\, boots\, warm layered gear\, water\, other food as needed.\n
LAST-MODIFIED;VALUE=DATE-TIME:20070104T173249Z
LOCATION:Baker Trail\, North of Vowinkle\, PA
URL:http://ns2.commandsystemsinc.com/Members/pabrunner/Coon%20Creek%20Brid
 ge%202007
END:VEVENT
BEGIN:VTIMEZONE
TZID:US/Eastern
X-LIC-LOCATION:US/Eastern
BEGIN:STANDARD
DTSTART;VALUE=DATE-TIME:20061029T010000
TZNAME:EST
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
END:STANDARD
END:VTIMEZONE
END:VCALENDAR
